After making a trip to the local hardware store to purchase some paint and some material to fix the piping to my sink I continued working on the arcade cabinet around 1pm.
Having a new box of screws I began attaching the left over leads to the left side. After the rest of the leads were attached it was time to move the project from the garage to the basement for final assembly.
Knowing that the completed cabinet would be to heavy to carry into the basement bar, my workout room was transformed into a work room where the two sides were connected with the front and rear braces.

After putting the braces in I added the floor, monitor shelf, and back panel. Around 3pm my father showed up with his reciprocating saw so that I could cut the nasty old galvanized pipe and replace it with a new pvc pipe… a whole other project. Once the plumbing project was complete my father stuck around cutting out the rest of the panels.

While my father cut all of the other pieces, I attached them and made the keyboard drawer completing the project shown above (minus the bottom door, it is not attached for painting purposes).
At about 8pm I added the casters and rolled it into the bar where I could add a coat of primer and clean up the workout room.

I removed the keyboard drawer and finished up this evening with a nice coat of primer. I did notice that I forgot to drill some more ventilation holes on the back panel, these along with the speaker and controller holes will be drilled before the final paint job.
Now I just need a cool marquee and side art to add after I paint the final black coat…
Recent Comments